First on the agenda of priorities when EPWU assumed responsibility for the Stormwater Utility in March 2008 was a concerted effort to catch up on long-deferred maintenance. More than 1,200 projects were completed in the first year of operation. These pictures illustrate both the challenges and the responses.
 |
 |
Pershing Dam needed significant clean-up.
|
Pershing Dam, after clean-up, will protect local neighborhoods.
|
 |
 |
Thousands of system inlets must be kept clear to prevent flooding.
|
EPWU has returned hundreds of inlets to pristine condition, but ongoing maintenance is required. The public can help by not discarding anything that might clog inlets.
|
 |
 |
Eastside Stephanie Basin failed in July 2008, flooding the neighborhood in the background.
|
Stephanie Basin today is not only restored but improved.
|
|